Rapid Prototype Company

Your First Choice for
SLA™, SLS™ and Cast Urethane Parts!

SECONDARY TOOLING
(Silicone Rubber Tooling)



Secondary Tooling is used for producing 10-50 pieces of a single part. This method is one of the quickest and most cost-effective for replicating your prototype master. You may select from a range of urethane materials with properties that simulate the thermoplastic materials often used in production. This process also produces small and large parts with excellent part detail.



Machined Aluminum Tooling is used to create 500 to 5,000 units, depending upon material type.
Aluminum Tooling can bridge the gap, before production tooling is available.



PROTOTYPE TOOLING TIME REFERENCE CHART

 
Silicone Rubber Machined Aluminum
Lead Time 2-4 Weeks 3-10 Weeks
Typical Part Quantities 10-50 50-100,000
Materials Urethanes, Epoxies, Waxes Thermoplastics

Copyright © 2007 - Rapid Prototype Company.     All rights reserved.
All trademarks and logos shown are the property of their respective owners.

4141 N. Atlantic Boulevard, Auburn Hills, MI 48326
Phone:  (248) 391-6600     Fax:  (248) 393-8430
E-mail:  rapid@rpparts.com